The small-business network closet checklist

Twelve things a properly finished network closet has, and why each one saves you money the next time anything breaks.

A network closet is the one part of an office nobody looks at until something stops working, and then everyone looks at it at once. Here is what a finished one has. If yours is missing more than three, a clean-up visit will pay for itself the first time a technician does not have to trace a cable.

The checklist

  1. A patch panel. Building cabling terminates on a panel, not directly into a switch. Changes become a patch cord instead of a re-termination.
  2. Labels at both ends. Every port on the panel matches a label on the wall jack. Machine-printed, not Sharpie.
  3. A port map. A one-page document: which panel port goes to which room and what is plugged into it. Photograph it and keep it with the lease.
  4. Correctly sized patch cords. Six-inch and one-foot cords between panel and switch. Six-foot cords coiled in a loop are how the rat's nest starts.
  5. Cable management. Horizontal managers between panel and switch, vertical at the sides if it is a full rack.
  6. A UPS. The switch, firewall and any controller or NVR on battery backup, sized for fifteen minutes, so a flicker does not reboot the network mid-call.
  7. Ventilation. Closets with the door shut and no airflow cook equipment. A louvred door or a quiet fan is enough.
  8. A firewall that someone configured. Not the ISP's modem in router mode with the default password.
  9. VLANs. Staff, guests, printers, cameras and the card terminal do not belong on one flat network. This is also what your cyber-insurance questionnaire is asking about.
  10. Documented credentials. Switch, firewall, Wi-Fi controller and NVR logins in a password manager the business owns, not in a technician's head.
  11. Spare capacity. Two or three free switch ports and a couple of spare panel ports. The next printer always needs one.
  12. A photo. A picture of the finished rack, dated. When someone changes something, you will know.

The one-hour test

Hand the port map and the rack photo to someone who has never seen the building and ask them to find which switch port the boardroom TV is on. If it takes more than a minute, the closet is not finished.

What it costs to fix

A clean-up on a typical small office (one rack, twenty-four to forty-eight ports) is a day's work: trace and map, add a panel if there is not one, re-terminate, label, add management and a UPS, document. We schedule it outside business hours and stage it so only one link is down at a time. It is the least glamorous job we do and the one clients thank us for most.

officerackcablingdocumentationchecklist

Written by RelayPoint Technologies

Cabling, networks, cameras, access control, smart homes, hosting and software for homes and small business across Southwestern Ontario. Twenty-plus years in the trade, and we still answer the phone.

Free site visit

Tell us what you're trying to do.
We'll tell you what it takes.